Design and supply of energy installations

EFITEKNA engineers have vast experience in the design and construction of energy projects. The size of the projects carried out covers a wide range, from small micro-cogeneration or renewable energy facilities (less than 100 kW), to large combined-cycle cogeneration plants of up to 100 MW.

  • Comprehensive engineering services, assuming the Management and Direction of the project

  • Equipment purchase management

  • Construction management and health and safety coordination

  • Permitting

  • Design and delivery of turnkey power plants

PAPRINSA COGENERATION

In this cogeneration plant, an old gas turbine was replaced by a new 7 MW model Taurus 70 from the manufacturer Solar Turbines.

 

Relevant civil works were necessary, such a new concrete foundation, and adapting all the auxiliaries (mechanical, electrical and control systems) to the new turbogenerator, including the exhaust gas duct to the existing recovery steam generator.

PROJECT

Renewal project of a taurus 70 Solar gas turbine generator in paper mill Paprinsa.

 

COMPANY

Papelera del Principado, SA

In this cogeneration plant, an old gas turbine was replaced by a new 7 MW model Taurus 70 from the manufacturer Solar Turbines.

 

Relevant civil works were necessary, such a new concrete foundation, and adapting all the auxiliaries (mechanical, electrical and control systems) to the new turbogenerator, including the exhaust gas duct to the existing recovery steam generator.

PROJECT

Renewal project of a taurus 70 Solar gas turbine generator in paper mill Paprinsa.

 

COMPANY

Papelera del Principado, SA

HYDRO POWER PLANT EL TOQUI

The TOQUI project consisted of the expansion of the Toqui Mine hydroelectric plant, in Chilean Patagonia. A 1.9 MW electric power Francis type turbine was installed, manufactured by Andritz Hydro in France.

 

All the electricity generated avoids the consumption of diesel at thethe mine’s power station which is based in several diesel engines. This is an isolated network not connected to the distribution network. The environmental and economic benefits are very relevant, with a decrease in diesel consumption of 1,700,000 liters per year. This project emerged as a result of the global energy audit performed at the whole mine, among other saving measures.

PROJECT

Feasibility Study, design, erection and comissioning project for the expansion of the “El Toqui” hydroelectric plant, Patagonia – Chile.

 

COMPANY

NYRSTAR

The TOQUI project consisted of the expansion of the Toqui Mine hydroelectric plant, in Chilean Patagonia. A 1.9 MW electric power Francis type turbine was installed, manufactured by Andritz Hydro in France.

 

All the electricity generated avoids the consumption of diesel at thethe mine’s power station which is based in several diesel engines. This is an isolated network not connected to the distribution network. The environmental and economic benefits are very relevant, with a decrease in diesel consumption of 1,700,000 liters per year. This project emerged as a result of the global energy audit performed at the whole mine, among other saving measures.

PROJECT

Feasibility Study, design, erection and comissioning project for the expansion of the “El Toqui” hydroelectric plant, Patagonia – Chile.

 

COMPANY

NYRSTAR

CORA COGENERATION

The project consisted of the replacement of two double-effect lithium bromide absorption chillers with two new units with increased power and better performance.

 

The new Thermax machines have a cooling power of 2.9 MWf each and provide the attached industry with the required industrial cooling and comfort needs.

PROJECT

Feasibility Study, design, erection and comissioning project for the renewal of two absorption machines at Amcor site.

 

COMPANY

Cora Cogeneración, S.L.

The project consisted of the replacement of two double-effect lithium bromide absorption chillers with two new units with increased power and better performance.

 

The new Thermax machines have a cooling power of 2.9 MWf each and provide the attached industry with the required industrial cooling and comfort needs.

PROJECT

Feasibility Study, design, erection and comissioning project for the renewal of two absorption machines at Amcor site.

 

COMPANY

Cora Cogeneración, S.L.

BIOGAS PROJECT AT UTE TEM

From the feasibility analysis to the start-up, this project was carried out with the aim of optimizing the use of biogas at the energy recovery cycle of municipal Waste-to-Energy plant at UTE TEM, in Mataró (Barcelona).

 

A biogas blower, transport pipes and two air jet burners were installed in order to preheat the primary air from the two incineration furnaces.

PROJECT

Project to install a biogas burner for primary air preheating in an incinerator furnace.

 

COMPANY

UTE-TEM Mataró

From the feasibility analysis to the start-up, this project was carried out with the aim of optimizing the use of biogas at the energy recovery cycle of municipal Waste-to-Energy plant at UTE TEM, in Mataró (Barcelona).

 

A biogas blower, transport pipes and two air jet burners were installed in order to preheat the primary air from the two incineration furnaces.

PROJECT

Project to install a biogas burner for primary air preheating in an incinerator furnace.

 

COMPANY

UTE-TEM Mataró

ANALYSIS FOCUS
  • Fluid dynamic analysis (CFD – COMPUTATIONAL FLUID DYNAMICS) uses applied mathematics, physics, and computer software to visualize how a fluid behaves, as well as to evaluate related heat transfer balances.

  • CFD is a key tool to:
    – Calculate and improve the real technical performance of equipment
    – Identify and correct operating problems in equipment and systems

TYPICAL CASE STUDIES

Some examples of successful cases using CFD analysis:

  • Analyze steam production in boilers before start-up

  • Analysis of the combustion of a biomass boiler to reduce CO / NOx emissions

  • Vibration analysis in recovery boiler associated with gas turbine

  • Calculation of head loss in HRSG and impact on gas turbine performance

  • Structural and fatigue calculation in equipment with cyclical start / stop operation

THE TARGET
  • Thermal balances in systems:
    – boilers / dryers / heat exchangers / furnaces

  • Vibration analysis

  • Structural and fatigue analysis

  • Provide clear and defined conclusions

HOW WE WORK
  • Plant visit for field measurements: temperatures, flows, emissions, pressures

  • Detailed equipment modeling

  • Computational calculation

  • Report. Conclusions and next steps

ALBANESI – CENTRAL ROCA

The Roca Electric Power Plant, located in Córdoba Argentina, is a 150 MW combined cycle in which a recovery boiler from the manufacturer Ricca has recently been installed for additional electricity generation in a new steam turbogenerator group.

EFITEKNA was in charge of validating the thermal and mechanical design of the steam generator, and solving construction anomalies that were detected during commissioning. EFITEKNA carried out a complete analysis by means of a fluid-structural study of said steam generator, as well as a mechanical, structural, and vibration study.

PROJECT

Validation, fluid-dynamic analysis and mechanical study of a recovery steam generator in Central Roca, Córdoba – Argentina

 

COMPANY

Albanesi Group (Argentina)

The Roca Electric Power Plant, located in Córdoba Argentina, is a 150 MW combined cycle in which a recovery boiler from the manufacturer Ricca has recently been installed for additional electricity generation in a new steam turbogenerator group.

EFITEKNA was in charge of validating the thermal and mechanical design of the steam generator, and solving construction anomalies that were detected during commissioning. EFITEKNA carried out a complete analysis by means of a fluid-structural study of said steam generator, as well as a mechanical, structural, and vibration study.

PROJECT

Validation, fluid-dynamic analysis and mechanical study of a recovery steam generator in Central Roca, Córdoba – Argentina

 

COMPANY

Albanesi Group (Argentina)